Hydro electric power station, Bodo

Marine contracting service work in a 40 m deep tunnel shaft at a hydro electric power dam. It's a challenge!

The project involved going down into a 40 m tunnel shaft to rinse the shaft and rinse the area in front of the bottom “ground” cover of the power station. The whole tunnel shaft was full of silt and sand which had to be removed, approx. 65m3.